Martens Demolition Company is since 1989 actively involved as ‘playing partner’ in the execution of large scale demolition and dismantling projects, On- as well Off Shore, asbestos removal, ground sanitation and recycling of valuable materials, both nationally and internationally. Our machinery (5 till 220T) are continously renewed.
With subsudiaries in Belgium, The Netherlands, Luxemburg and France we got the best suitable people with the right machines on the demolition sites in Europe. We operate under a single flag we are able to combine our experience and expertise to enable us to serve you in all areas.
Since we are VCA-P, ISO 9001 and ISO 14001 certified, and all our employees have benefited from the best training, we can consistently guarantee the top quality of our services.
Our main activities are:
Demolition of industrial buildings
Selective dismantling and stripping of industrial buildings
Demolition of power plants
Demolition of concrete structures
Demolition of steel structures
Outbreak of concrete pavements
Demolition of chimneys cooling towers, etc
The demolition of the steel plant in Gandrange FR started in April 2020 and is still ongoing A team of 6 burners and 4 demolition cranes is continuously present
Read moreDemolition of a testbuilding for productionunits. This building was 24m high and build on extremely heavy steal constructions
Read morehttps://today.rtl.lu/news/luxembourg/a/1346116.html?fbclid=IwAR1u9j_OOaWvq2CLAFmwNcOfJFMQohfsjShxVmUAMtxe3Ss95K3lYr5dTQ8
Read moreformer powerplant Hagedorn at Dortmund, our Hitachi 870 UHD is present
Read morekick off in May 2018, end of work in February 2019!
Read more2017 - demolition with Hitachi 870 commissioned by Stricker.
Read moreFor our customer Ford Genk, we demolish a conveyor with a total length of 900 meters. The conveyor was the liaison between the customer and the suppliers.
Read moreThe digger was never used. The site on which the machine was located, would be explored in the near future.
Read moreThe project relates to the demolition of a steel mill. Large machinery in place: Komatsu 1250 with iron cutter of 25 tonnes, Hitachi 870 with demoltion boom of 50 meters.
Read moreThe powerplant was shut down in 2011. We began the demolition of the whole site in march 2013, including the demolition of two smoke stacks of 140 meter. Large machinery on site: Hitachi 120 triple, Hitachi 870 with telescopic boom of 50 meter, Komatsu 1250 with tool of 15 ton.
Read moreAfter the removal of the asbestos, we demolished the 9 refurnish ovens. Machinery used during the demolition: - 2 * Hitachi 470 - Hitachi 870 HRD with heavy duty boom - Hitachi 350
Read moreDemolition of 44 meter high cooling tower withe Hitachi 870 telescopic boom 46 meter
Read more